Advantages and Uses:
1, with excellent adhesion, good enhancement of sag resistance, water retention, water resistance, aging resistance and operability. Simple construction, no toxic pollution.
2, used for internal, external wall and ceiling insulation board paste; Can also be used to paste tiles, gypsum board and so on.
Building external insulation is a new building energy saving technology designated and promoted by the state in recent years, which has an incomparable advantage of insulation.
Technical performance:
1, with non-toxic, tasteless, green environmental protection, good weather resistance, good water resistance, good corrosion resistance, long service life.
2. Strong bonding force and fast curing time can effectively prevent loosening, falling and deformation caused by accidental external force after bonding.
3, from the bonding principle, it is a mechanical sleeve, its molecules can penetrate into the wall and insulation board expansion, like playing countless expansion nails, unlike other products are only bonded.
4, excellent waterproof performance.
5, the adhesive mortar field mixing has good workability, good operability and good durability. Freeze-thaw resistance, small shrinkage rate, no cracking, no empty drum, no falling off.
Scope of application:
1. Bonding between the insulation board and the base wall in the external insulation system of the building exterior wall.
2, suitable for all kinds of walls.
Usage and precautions:
1, the base level should meet the corresponding requirements, the surface without oil, release agent, drum and weathering and other debris affecting the bond.
2. Apply the mixed adhesive material on the insulation board by the point frame bonding method. Smear a circle of mixed cement around the board, its width is 50mm, evenly smear 5 points in the center of the board, and ensure that the paste area is not less than 30%, and then the insulation board is directly attached to the wall. The insulation board should be flat. (Note: a mix should not be too much, with mixing, generally used within 2h).
3, the construction temperature can not be lower than 5 ℃, the wind is not more than 5, rainy days can not be constructed.
Packing, storage and transportation:
1. This agent is packaged in woven bag.
2. The agent is stored in a dry and clean warehouse to avoid rain and moisture. The caked agent can be dried and crushed and can be used without affecting the use effect.
3, transport should be rain and damage.
Specification

Production
